目錄
Content
1技術(shù)措施的依據(jù) 1
1 Basis of compilation 1
2工程概況 2
2 Project overview 2
3施工應(yīng)具備的條件 7
3 The condition for construction 7
4施工主要機(jī)具及材料 7
4 Major equipment and material 8
5施工方法、步驟 9
5 The construction methods and process 9
6勞動力配置及工期 18
6 construction duration and labor allocation 18
7施工應(yīng)達(dá)到的質(zhì)量標(biāo)準(zhǔn)及工藝要求 19
7 Quality standard and technology requirement 19
8安全及施工要求 24
8 Safety and construction requirements 24
9成品及半成品保護(hù)要求 26
9 Protection requirements of finished products and semi-finished products 26
10附表sheet 27
10Attachment 27
附表1 28
Attached Table 1 28
附表2 47
Attached Table 2 47